I also used a free-standing deck instead of a ledger attached to the house, because of the design of the house. The rear entry overhangs the ground where the deck would be attached, making it a weaker contact point.
I also dropped the deck floor 7 inches to make it more weather proof at the house (snow/rain and dirt can't enter the house this way.
I will clean up the siding and fill the holes with weatherproof calk to protect the structure underneath. I will also install a piece of aluminum flashing under the door sill to close up the gap.
Still left to do:
1. Finish installing the decking (1o boards 2x6)
2. Install the stairs (2 2x10 boards, 1 2x6 board)
3. Install the railing (10 2x6 boards, 6 2x4 boards)
4. Use miscellaneous hardware for the stairs and railings
5. Stain and seal the whole thing.
1. Finish installing the decking (1o boards 2x6)
2. Install the stairs (2 2x10 boards, 1 2x6 board)
3. Install the railing (10 2x6 boards, 6 2x4 boards)
4. Use miscellaneous hardware for the stairs and railings
5. Stain and seal the whole thing.